27/06/2016

After the pre-installed floor surface, interior must be completed over the floor surface of the bearing capacity of the device into the room a predetermined position can be carried out, may not cross construction; inspection activities under the floor surface laying cables, pipes, ensure that the correct before laying floor surface.

First in the beam laying down buffer strips, and liquid latex binder and beams. Laying floorboards adjust the level of activity in order to ensure contact with the four corners of the flat, tight, can not use padded.

Laying activities floorboards do not go along with the modulus, the shortfall will be based on the actual size of the board after cutting inserts complement, and is fitted and the corresponding adjustable support beams. Cutting edge plus varnish or epoxy talc proportion according to design requirements into a putty Edge, Edge also available moisture putty is required before installation with high aluminum inlay.

And seams in the wall, according to the gap width were used floor high-strength plastic or wooden brush mosaic, slit with foam insert, and then check the adjustment plate levelness and cracks. Before proceeding to set up a large area, you should first big release like construction, and do model, the time after the accreditation by the quality inspection department before the organizations according to the requirements of the standard model construction.